There have been numerous calls from Drascombe owners over the past month wanting to talk through their options or seek advise on how to tackle certain tasks. Due to this I have decided to do very regular stories/blogs on my new section of the website called “Phil’s Workshop Blog”.
This will cover advise on materials, the manufacturing processes that are involved and upgrading the products to be more effective and compliant. Moving forward and away from what is known as ‘The Traditional Drascombe way’. Aspects of design and methods were questionable 30 years ago and with advancement in materials and bonding chemistry my aim is to develop and improve on the products used.
Foresail and kit delivered to Paxos
I made up a kit with this jibsail from R&J Sails all the necessary fittings and rope work for Orlando to fit to his Longboat in Paxos
Replacing a Transom Engine Bracket
The engine mounting bracket has to carry a heavy load, and it’s important to check the integrity, replacing if necessary
Refreshing Lugger Jojo
This joinery work was carried out at Dragon Design over the winter of 2025 and fitted back into Lugger Jojo the first week of July 2026 at my Nidri base
A Re-engineered Gaff
The problem of shipping overseas is the length restriction, and the Gaff is just 135 mm too long! Time for some engineering…
Swimming Ladders
After 6 weeks of machining Iroko for the larger joinery pieces, I have an opportunity to use the offcuts for swimming ladders
Making the JLJ tiller and extension
Whenever I have been producing joinery out of East African Utili, I have put the offcuts to one side ready for re-machining into laminated tillers.
Cure that leak from below your mast foot block
Many Drascombe owners don’t realise that this may be the source of the water ingress problem in the bilge of the boat
Continue Reading Cure that leak from below your mast foot block
New steelwork for the new season
Buying metalwork in quantity is the only way to do it
Creative Packaging
Here’s a great ‘Creative Packaging’ idea for shipping the JLJ dry jointed keelbands to the US and beyond!
Workshop Course 2 Report
What an opportunity this was to have father and son working on their respective father’s and grandfather’s Drascombe Lugger over this 4 day period.
Anchor Storage for Stock
Another task to top up my stock includes the deck mounted ‘shoes’ for securing the great Delta spade anchor
Another week making stock joinery
My recent Practical Workshop Courses have made a big impact on my joinery stock levels, so it’s time to replenish.
It’s making time again to build up and refresh the joinery stock
The Mizen mast Thwart/ rudder step is a joinery piece that I have re-engineered from the original design and to give it more strength at the aft section of the mast slot.
Continue Reading It’s making time again to build up and refresh the joinery stock
Workshop Course 2 – Restoring ‘Kelpie’
For this second Practical Course just finished yesterday I had an aged, badly maintained and abused Lugger as a project boat, which has a very interesting history and background.
The Girl Christina
Christian was so delighted with the work done on the workshop course that he left the Lugger with me for an extra 10 days so I could do additional work and add more of the JLJ joinery and fittings
Workshop Course 1 Report
If you’re thinking of joining one of our courses and wonder what goes on, here’s a flavour from our first course of 2026.
Workshop Course 1 Completed
What a great week! Thanks to Christian, the project boat owner, and Paul and Fearghal, all enthusiastic participants, who went away with a wealth of new knowledge and skills
New Drascombe Coaster Mast
John needed a new mast for his Drascombe Coaster with the base section to suit the existing deck-mounted Tabernacle.
Gunwale capping rails forming
Fearghal, who is participating in one of my workshop courses, has ordered a pair of Gunwale capping rails to be prepared and braced up so he can take them back home with him at the end of this week’s course.
Plan for Workshop Course 1 – 2026
This 4-day course starting on Jan 21st will focus on replacing the centreplate pivot pin, keelband and beaching rails, plus repairs to the hull.
Drascombe Longboat Cruiser ‘Egret’
This project was undertaken by Drascombe Nederland on a boat based in Amsterdam. For some time the boat had been taking in water. It was time to find out why.
News from the Workshop
Spar production has gone well this past winter and we now hold quite a stock of finished masts, bumpkins and gaffs
News from the Workshop
We have built up a good stock of parts over the winter. Here are some ideas for enhancing your beloved Drascombe
Sean’s 40+ year old Tiller Head and Stub
This is Sean’s story of a new JLJ tiller being supplied and fitted to its existing alloy tiller head. As proposed to Sean he cut the old tiller close to its alloy head, there were still…
A Boom for a Lugger!!!! + Update
A boom for a Lugger!!! What a suggestion I heard from devoted Lugger owners! Nic who is based on the East coast wants to get a better sailing performance in the restricted waters of East…
Flooring for ‘Damson Drifter’ hull number 5
A new project arrived at NP22, Simon has travelled down from North London with the complete flooring out of his Drascombe Drifter. It’s a 1970’s built hull with its original flooring, all in a very…
Continue Reading Flooring for ‘Damson Drifter’ hull number 5
Refurbishing of Main Masts, Bring it to the Mast Doctor in late 2024/25
As a continuation of my Drascombe manufacturing work and fittings service, for late 2024/early 25 I will be undertaking the repair and refurbishing of damaged and neglected masts and spars. This Spruce mast illustrated is…
Continue Reading Refurbishing of Main Masts, Bring it to the Mast Doctor in late 2024/25
The use of Laminating Material to achieve Greater Strength
Below we can see the standard Lugger engine mounting bracket split between its top fixing bolts. I have seen this issue so many times where the backward thrust from the engine head finds the weakness…
Continue Reading The use of Laminating Material to achieve Greater Strength
The Making of a Mk.3 Mast Thwart
The Mk3 mast thwart is longer than the older Mk1&2 models so I start with preparing a section of Iroko out of 25mm sawn stock boards, this comes in at approx. 28mm in thickness. It…
BREAKING NEWS FOR DRASCOMBE FOLLOWERS OF JLJ
From December 2024 I will be running 3 and 5 day practical woodworking/ joinery and finishing, Bespoke Workshop Programmes at the factory workshops of Dragon Design, NP224LA. This will involve both hand tool skills, the…
Continue Reading BREAKING NEWS FOR DRASCOMBE FOLLOWERS OF JLJ
Making of Main Masts and Spars Part 2
This is a continuation of the previous post looking at the making of Main Masts and Spars which can be found Here. With all the sanding and prep work completed it’s time to get the…
Making of Main Masts and Spars at Just Lugger Joinery Part 1
This is the start of the journey and of the processes needed to manufacture a 5085mm main mast for a Drascombe Drifter based on the Isle of Bute in The Outer Hebrides. It’s Neil’s detailed drawing of…
Continue Reading Making of Main Masts and Spars at Just Lugger Joinery Part 1
The Making of a Drascombe Dabber Transom Caping/Mizen step
The general build of this piece originally was to use a solid piece of Iroko at 16mm in thickness. It is a shallow sweep over its 1200mm length and was achieved by soaking in water…
Continue Reading The Making of a Drascombe Dabber Transom Caping/Mizen step

































