• Skip to primary navigation
  • Skip to main content
Just Lugger Joinery

Just Lugger Joinery

  • Home
  • Products
    • Joinery
    • Spars
    • Accessories
  • How to Do It
  • Client Stories
  • Workshop Courses
  • Phil’s Workshop Blog
  • Ordering

Phil’s Workshop Blog

There have been numerous calls from Drascombe owners over the past month wanting to talk through their options or seek advise on how to tackle certain tasks. Due to this I have decided to do very regular stories/blogs on my new section of the website called “Phil’s Workshop Blog”. 

This will cover advise on materials, the manufacturing processes that are involved and upgrading the products to be more effective and compliant. Moving forward and away from what is known as ‘The Traditional Drascombe way’. Aspects of design and methods were questionable 30 years ago and with advancement in materials and bonding chemistry my aim is to develop and improve on the products used.

Foresail and kit delivered to Paxos

July 31, 2026

I made up a kit with this jibsail from R&J Sails all the necessary fittings and rope work for Orlando to fit to his Longboat in Paxos

Continue Reading Foresail and kit delivered to Paxos

Replacing a Transom Engine Bracket

July 18, 2026

The engine mounting bracket has to carry a heavy load, and it’s important to check the integrity, replacing if necessary

Continue Reading Replacing a Transom Engine Bracket

Refreshing Lugger Jojo

July 11, 2026

This joinery work was carried out at Dragon Design over the winter of 2025 and fitted back into Lugger Jojo the first week of July 2026 at my Nidri base

Continue Reading Refreshing Lugger Jojo

A Re-engineered Gaff

March 17, 2026

The problem of shipping overseas is the length restriction, and the Gaff is just 135 mm too long! Time for some engineering…

Continue Reading A Re-engineered Gaff

Swimming Ladders

March 16, 2026

After 6 weeks of machining Iroko for the larger joinery pieces, I have an opportunity to use the offcuts for swimming ladders

Continue Reading Swimming Ladders

Making the JLJ tiller and extension

March 14, 2026

Whenever I have been producing joinery out of East African Utili, I have put the offcuts to one side ready for re-machining into laminated tillers. 

Continue Reading Making the JLJ tiller and extension

Cure that leak from below your mast foot block

March 13, 2026

Many Drascombe owners don’t realise that this may be the source of the water ingress problem in the bilge of the boat

Continue Reading Cure that leak from below your mast foot block

New steelwork for the new season

March 13, 2026

Buying metalwork in quantity is the only way to do it

Continue Reading New steelwork for the new season

Creative Packaging

March 13, 2026

Here’s a great ‘Creative Packaging’ idea for shipping the JLJ dry jointed keelbands to the US and beyond!

Continue Reading Creative Packaging

Workshop Course 2 Report

March 6, 2026

What an opportunity this was to have father and son working on their respective father’s and grandfather’s Drascombe Lugger over this 4 day period.

Continue Reading Workshop Course 2 Report

Anchor Storage for Stock

February 27, 2026

Another task to top up my stock includes the deck mounted ‘shoes’ for securing the great Delta spade anchor

Continue Reading Anchor Storage for Stock

Another week making stock joinery

February 25, 2026

My recent Practical Workshop Courses have made a big impact on my joinery stock levels, so it’s time to replenish.

Continue Reading Another week making stock joinery

It’s making time again to build up and refresh the joinery stock

February 21, 2026

The Mizen mast Thwart/ rudder step is a joinery piece that I have re-engineered from the original design and to give it more strength at the aft section of the mast slot.

Continue Reading It’s making time again to build up and refresh the joinery stock

Workshop Course 2 – Restoring ‘Kelpie’

February 11, 2026

For this second Practical Course just finished yesterday I had an aged, badly maintained and abused Lugger as a project boat, which has a very interesting history and background.

Continue Reading Workshop Course 2 – Restoring ‘Kelpie’

The Girl Christina

February 6, 2026

Christian was so delighted with the work done on the workshop course that he left the Lugger with me for an extra 10 days so I could do additional work and add more of the JLJ joinery and fittings

Continue Reading The Girl Christina

Workshop Course 1 Report

February 6, 2026

If you’re thinking of joining one of our courses and wonder what goes on, here’s a flavour from our first course of 2026.

Continue Reading Workshop Course 1 Report

Workshop Course 1 Completed

February 6, 2026

What a great week! Thanks to Christian, the project boat owner, and Paul and Fearghal, all enthusiastic participants, who went away with a wealth of new knowledge and skills

Continue Reading Workshop Course 1 Completed

New Drascombe Coaster Mast

January 21, 2026

John needed a new mast for his Drascombe Coaster with the base section to suit the existing deck-mounted Tabernacle.

Continue Reading New Drascombe Coaster Mast

Gunwale capping rails forming

January 20, 2026

Fearghal, who is participating in one of my workshop courses, has ordered a pair of Gunwale capping rails to be prepared and braced up so he can take them back home with him at the end of this week’s course.

Continue Reading Gunwale capping rails forming

Plan for Workshop Course 1 – 2026

November 21, 2025

This 4-day course starting on Jan 21st will focus on replacing the centreplate pivot pin, keelband and beaching rails, plus repairs to the hull.

Continue Reading Plan for Workshop Course 1 – 2026

Drascombe Longboat Cruiser ‘Egret’

November 9, 2025

This project was undertaken by Drascombe Nederland on a boat based in Amsterdam. For some time the boat had been taking in water. It was time to find out why.

Continue Reading Drascombe Longboat Cruiser ‘Egret’

News from the Workshop

March 31, 2025

Spar production has gone well this past winter and we now hold quite a stock of finished masts, bumpkins and gaffs

Continue Reading News from the Workshop

News from the Workshop

March 28, 2025

We have built up a good stock of parts over the winter. Here are some ideas for enhancing your beloved Drascombe

Continue Reading News from the Workshop

Sean’s 40+ year old Tiller Head and Stub

April 10, 2024

This is Sean’s story of a new JLJ tiller being supplied and fitted to its existing alloy tiller head. As proposed to Sean he cut the old tiller close to its alloy head, there were still…

Continue Reading Sean’s 40+ year old Tiller Head and Stub

A Boom for a Lugger!!!! + Update

March 30, 2024

A boom for a Lugger!!! What a suggestion I heard from devoted Lugger owners! Nic who is based on the East coast wants to get a better sailing performance in the restricted waters of East…

Continue Reading A Boom for a Lugger!!!! + Update

Flooring for ‘Damson Drifter’ hull number 5

March 18, 2024

A new project arrived at NP22, Simon has travelled down from North London with the complete flooring out of his Drascombe Drifter. It’s a 1970’s built hull with its original flooring, all in a very…

Continue Reading Flooring for ‘Damson Drifter’ hull number 5

Refurbishing of Main Masts, Bring it to the Mast Doctor in late 2024/25

February 26, 2024

As a continuation of my Drascombe manufacturing work and fittings service, for late 2024/early 25 I will be undertaking the repair and refurbishing of damaged and neglected masts and spars. This Spruce mast illustrated is…

Continue Reading Refurbishing of Main Masts, Bring it to the Mast Doctor in late 2024/25

The use of Laminating Material to achieve Greater Strength

February 10, 2024

Below we can see the standard Lugger engine mounting bracket split between its top fixing bolts. I have seen this issue so many times where the backward thrust from the engine head finds the weakness…

Continue Reading The use of Laminating Material to achieve Greater Strength

The Making of a Mk.3 Mast Thwart

February 8, 2024

The Mk3 mast thwart is longer than the older Mk1&2 models so I start with preparing a section of Iroko out of 25mm sawn stock boards, this comes in at approx. 28mm in thickness. It…

Continue Reading The Making of a Mk.3 Mast Thwart

BREAKING NEWS FOR DRASCOMBE FOLLOWERS OF JLJ

February 7, 2024

From December 2024 I will be running 3 and 5 day practical woodworking/ joinery and finishing, Bespoke Workshop Programmes at the factory workshops of Dragon Design, NP224LA. This will involve both hand tool skills, the…

Continue Reading BREAKING NEWS FOR DRASCOMBE FOLLOWERS OF JLJ

Making of Main Masts and Spars Part 2

January 9, 2024

This is a continuation of the previous post looking at the making of Main Masts and Spars which can be found Here. With all the sanding and prep work completed it’s time to get the…

Continue Reading Making of Main Masts and Spars Part 2

Making of Main Masts and Spars at Just Lugger Joinery Part 1

December 13, 2023

This is the start of the journey and of the processes needed to manufacture a 5085mm main mast for a Drascombe Drifter based on the Isle of Bute in The Outer Hebrides. It’s Neil’s detailed drawing of…

Continue Reading Making of Main Masts and Spars at Just Lugger Joinery Part 1

The Making of a Drascombe Dabber Transom Caping/Mizen step

December 12, 2023

The general build of this piece originally was to use a solid piece of Iroko at 16mm in thickness. It is a shallow sweep over its 1200mm length and was achieved by soaking in water…

Continue Reading The Making of a Drascombe Dabber Transom Caping/Mizen step

Copyright © 2026 Dragon Design · Contact Details · Terms & Conditions · Materials · About Us