• Skip to primary navigation
  • Skip to main content
Just Lugger Joinery

Just Lugger Joinery

  • Home
  • Products
    • Joinery
    • Spars
    • Accessories
  • How to Do It
  • Client Stories
  • Workshop Courses
  • Phil’s Workshop Blog
  • Ordering

Newsletter

Newsletter Spring 2026

Again to the Drascombe followers of Just Lugger Joinery&more along with its sister company Dragon Drascombe, Lugger sailing In the South Ionian sea, it’s spring time again and thoughts advance onto the sailing adventures that lie ahead. Now with the weather improving it’s time to get the boat cover off and to clean and prepare the boat.

As you will have noted, at JLJ this winter we have been kept busy with supplying boat owners with joinery and fittings for big maintenance projects and I have also hosted 2 Drascombe Owners Practical Workshop Courses based at the Workshops of my base company Dragon Design. Both 4-day courses were a great success as you will read on the website’s dedicated Practical Workshop page and I have just announced the dates of the next courses starting this coming November.

I’m sure as Drascombe owners you are well aware of the age of most of these boats that were built in the late 1960’s and onwards, and by now looking to have major upgrades and renovations carried out. With that in mind it’s a perfect opportunity to tackle these major upgrades in a supervised course environment. So, for Lugger owners who would like to bring their ‘Project Boat’, or owners who would like to be participating course members, I am now open for bookings.

As you will note from the attached images these major projects are best planned for the winter period, which leaves the final clean and adding of new accessories for springtime, ready for launching and another adventure.

My winter maintenance for the 9 Luggers which Dragon Drascombe operate is to keep all the joinery and fittings at a very high level of care. They spend their summers out on the water with clients in the harsh ‘Sea and Sun’, the worst of the 2 combinations. This pic 1 shows the side cockpit hatches that I made in 2019, and whilst I have diligently kept them oiled, there is a time they need to be taken off and brought back for a total refurb in the workshop. It’s evident that they look dry and without life.

This second picture show the transformation after cleaning back the surface with a spirit cleaner then re-oiling with many applications of Rustin’s Danish Oil. This is testament to the quality of the material and the manufacturing process back in 2019. They will now be refitted in early May when I get back to my boatyard base near Nidri.

And another winter task, cleaning and re-varnishing the JLJ-made Belay Pins.

Last November I took off two of the engine brackets and three buoyancy caps for a re-finish and re-oiling. So they now look as good as the day they were made back 5 years ago. I don’t have to tell Drascombe owners the benefits of purchasing a good quality piece of joinery or fittings, knowing that with good maintenance they will last a long time. That’s what I aim to do at Just Lugger Joinery&more!

Lugger Kelpie was the second project Lugger brought to the Practical Workshop Course by its owner Paul and his Dad. Paul has made great strides in his re-fitting of the boat back at home, and to add something very special he ordered a Lazarette floor and one on my tiller and extension units. Read the review of Kelpie’s major re-build work on the February course.

This is what Paul has said about his new tiller assembly:
Package was waiting for me when I got home on Friday evening, tiller handle is a thing of beauty!

For what it is, in my opinion one of the biggest upgrades one can make to the boat, for so little time to fully paint, finish and fit, and not costly, is the aft Lazarette flooring. It raises the area by 60 mm and produces a flat finish, and most of all it keeps bags and clothes dry. There is inevitably always a drop of water sloshing around in the shallow bilge. this certainly does the job. There is a Mk2 and Mk3 version, the difference being only the cut-out for the rudder casing, which differs between the two models.

The 2-part floor has an overlap, and the 60 mm block supplied sits under the overlap on the hull floor. All you need is a spot of waterproof adhesive to adhere it to the floor and then use the screw provided to fix both leaves down.

The overlap is created by resin bonding a cleat under the port side leaf and the starboard side leaf slots up to it nicely.

You will note from my past blogs and reviews that when I manufacture, or get manufactured, I always do it at scale. I have just collected this morning from Karen, my Seamstress near my home in Wales, 40 deck cushions and 10 Lugger Biminis with 4 of the longer Biminis for the Longboat / Cruiser models. By Saturday several of each product will be packed and dispatched to awaiting Drascombe owners.

The Biminis are well-tested by Dragon Drascombe out in the Ionian Sea where they are of the same importance as the outboard engine. Even in the UK / North Sea sailing areas, the latter for the Dutch contingent of Drascombe owners, they are good to have. I would not go out in a boat without one!

The cushions too. I recall the first time I sat in a Lugger, within an hour I was searching for something to sit on and to open out as a back rest against the Gunwale rail. Another vital part of the kit to have on board.

This spring when I leave the UK for the 6-day drive to the Ionian Sea, including 2 ferry crossings, my first stop and drop-off point will be near Lille in Belgium where I will meet up with Michel from Drascombe Nederland; he is my sole agent for JLJ in Europe. I’ll be stocking him up with joinery, spars and fittings ready for his busy summer of supplying and fitting these pieces at his base.

Also for when I get to my Nidri base I have had a request from 3 Longboat owners based on the island of Paxos, this is south of Corfu.

The first laid out on my bench is for Adam, he will get

  • A Bimini (a very wise move I may say)
  • 2 Deck Cushions (again I’m not sure how he’s managed without then up to now)
  • One of my solid rudders

To complete the order will be one of our Swan Neck tiller and extension kits to fit his Davey& Co bronze tiller head.

Martin had a rudder made locally a couple of years ago, not galvanised so he will get a new rudder as a matter of urgency.

I have been in discussion with Orlando for some time about his very damaged and torn jib sail on the relative merits of a repair or replacing with a new sail and at the same time discarding his fixed jib forestay wire and foil and replacing with a new head sail with the forestay wire sewn into the forward edge of the sail. It’s so much easier to set the sail, to pull out by releasing the furling drum line and control the sail with the jib sheets.

So I have had the sail made by Dick at R&J Sails, and I’ve made up the jib halyard with a top sheave that connects to the mast head ring, and a swivel that connects onto the head of the rail. At its base and connected to the stem head fitting is a short spacer, then the furling drum. Job done and not difficult to assemble.

All 3 orders will be put on the daily ferry that stops in Lefkas Port each afternoon on its way to Corfu, Martin will intercept these packages when the ferry calls into Paxos en-route for Corfu.

I do hope you all have a safe and enjoyable summer of sailing in the UK. Or for those that have looked at the Dragon Drascombe website and find the sun, sea conditions and the Greek hospitality appealing, why not give it a go. Lugger sailing is great generally, however sailing out in the Greek Ionian Sea is so special.

A Re-engineered Gaff

The problem of shipping by courier companies for an overseas delivery is the length at 3m, the weight for centre plates can also be a problem. Whilst main spars are going to require a dedicated shipping company or a part load carrier, which just has to be accepted, the Gaff is just a fraction too long, 135 mm over!

Last summer I had a Gaff to get out to the States for a Lugger owner. I called my DHL agent and explained the small amount of over-length of the Gaff and was told it would be OK. Not so. It was collected, logged in and then silence. 

I was not informed of the problem and it sat in the DHL transit depot for almost 2 weeks. They had rejected it and finally came back to my colleague Martin, labelled as over length. My client in the States was not amused, but accepted the problem.

I looked at this issue and realised that the Gaff was made up of 2 components, the one being the Gaff itself, and the other the lower claw and it’s box section that slides onto the end of the Gaff.

So, what if I reduced the length of the gaff for shipping purposes and then made a longer stainless tube sleeve with claw so when the both components were assembled the overall length of the Gaff would be the standard length and not affect the length of the sail that would be laced to it? Onto the drawing board it went and with a detail to Steve at Tredegar Fabrication he produced these modified claw and sleeve assemblies.

Here we have the Gaff fully assembled and with the claw assembly removed ready for the Gaff to be packaged and collection made by DHL.

I have 6 of these extended Gaff claw assemblies now in stock. Bernard in Portland had this package delivered within 5 days to the States. Enjoy your sailing this summer, Bernard.

When he received his delivery, Bernard commented: Looks like a beauty! Thanks so much. Glad you figured out a solution for your customers abroad

Swimming Ladders

I have had well over 6 weeks of machining Iroko for the larger and longer Drascombe joinery pieces, all of which produce quite a lot of long and very narrow lengths along with short wide pieces off the length of boards.

So another opportunity to make very good use of this potential waste material and recycle it into the JLJ swimming ladders. In the colder climes they are known as boarding ladders! Whatever, they are perfect for getting into the boat from the water after swimming or in an emergency.

For the legs of the ladders I use a section of 31 mm wide by my stock thickness of 21 mm. These are all pre-drilled / square housed for pegs or dowels. The ladder treads are machined out of short pieces that come off the ends of boards.

I only manufacture these ladders when I have sufficient offcuts and short ends to cover at least 8 plus units. So here we go…

A typical short section of Iroko that comes off a long board, having been cut for Keelbands and the other larger joinery pieces.

You will have followed my manufacturing processes on the website to understand by now my objectives in these making procedures. That is to firstly ‘de-skill ‘ processes, set up repetitive procedures by using jigs and formers, and have a systematic plan of how each task is carried out so there is no overlap.

I have the ladder legs cut and all holes drilled from a former, not individually measured but taken from the master pattern. The treads are all made to an identical width and ready to fit onto a jig so a router can form the slot that the leg slides onto.

Moving on with the tread shape and top face profile.

The accuracy of the sliding slot is important and so is the clean chamfered finish.

Again being a very repetitive process, the router is set up to do all these treads in one hit. Then move on the next procedure.

With the slots chamfered it’s time to radius the tread top face.

With all the treads machined I get the job prepared with all its component pieces and fittings to make sure I’m not held up with missing material or fittings.

The ladder units are now complete. The legs have their lower blocks fitted and all pieces are fully sanded. Just 10 top hook stainless hangers to collect from my stainless manufacturer, Tredegar Fabrication, and all will be done.

Over the past 15 years I have modified the design and manufacturing procedures of these ladders and with them being used out in the Ionian on my Dragon Drascombe charter Luggers I’ve been able to refine the concept.

A very important part of the design is that the legs and treads are all fully free to move independently of each other and not fixed. You will note the treads rest on a lower block or mid leg square section and are not screwed on but kept in position by a 6 mm dowel peg.

The treads are supported and allowed to be free to move to the side when pressure is applied to the ladder when the body weight and movement dictates.

A simple neat finish. The only aspect that can become loose or worn are the supporting pegs and dowels, so I supply a bag of replacements with the ladder.

The assembly stage has now progressed and will quickly move to the completion of this batch. It will bring my stock up to 15 ladders for this summer. So don’t delay and get an order in since I will not be making any more until early 2027.

The first one with its white protective pads applied to the top gunwale hooks and the mid knees that connect with the hull planking. Again it’s only JLJ that produce these ladders to such a degree of accuracy and performance.

Once packaged it will be ready for stock and shipping

Making the JLJ tiller and extension

From the past 5 years plus, when I have been producing major joinery out of East African Utili (a very good quality Hardwood in the Mahogany family), I have put the slices of offcuts to one side ready for re-machining into the sections needed to make up the laminated tillers. 

By laminating out of 3 sections I can create the Swan Neck effect without loosing any strength when this shape is produced. By not having any common grain in the laminations when cutting this shape I’m able to still have a very strong tiller and not having a weakness on the swan neck.

This is the start of the process. All Utili outside laminations are cleanly machined with a third inner lamination of White American Ash. These will then be bonded in clamps in a West Resin process to give me the solid blank to form the shape.

The bonded blanks are then ready to be profiled. The blank is initially shaped on the bandsaw and cut to length before any sanding and moulding is attempted.

I have moved on from a roughed out shape profile to an accurate sanded finish which allows me to machine-finish the top edge curved profile. This gives it a very nice and distinctive profile.

The Swan Neck curvature of tiller shows clearly the benefits of the 3 laminations, no common grain to cause a weakness.

Whilst the majority of tillers in stock are made to fit the Davey &Co bronze tiller head, I have a least 6 of the tillers that are machined to fit the older Aluminium tiller head casting. So if you wish you can post me your existing tiller head and I will fit it to the new tiller, at no additional cost. All fully spray varnished finish.

I have the jigs and formers for machining this tiller head recess quit accurately given that these bronze heads are still moulded in sand moulds by Davey &Co. They do need a little easing with a chisel on my final fit however. So, a great finish.

From the batch of 12 tillers I’m making I do the moulding and hand finishing processes in a unit of 3 tillers, then progress to the extension back in a batch of 12.

These extensions are out of White American Ash, a close grain, reliable and easy-to-machine material. I have jigs set up to produce the neat shallow slots that the swivel knuckle fits into. The top of the extension arm is then radiused prior to sanding.

All completed now with the swivel knuckle fitted and ready to recess the base of the swivel knuckle into the tiller arm. Again once set up in the jig the recess slot is machined accurately and very quickly.

These repetitive processes which are tedious are also time consuming for the customer, so my aim is to take out all these time consuming elements to reduce the overall, labour element of cost in my work. It’s very accurate and cost effective.

And here is the tiller extension holding lock

All of the first set of 3 tillers I’m making extensions for are complete and ready for the spray finishing. The fourth tiller and extension is to be re-packaged ready for its delivery in May to Abram’s Longboat on the Island of Paxos.

Another successful unit complete! Within a week there will be 14 tillers and extensions ready in stock fully finished and ready for shipping out to clients.

New steelwork for the new season

For economy of scale as readers will understand it’s essential to buy in from manufacturers in quantity. From the point of view of the making process, to make a one off is very time consuming so whilst cutting the material for one, why not cut for 10 rudders and then so much time is saved. It means the whole batch can go for the galvanising process saving time and transport costs.

The great benefit is when a client orders a rudder it is in stock, no wait for one to be made, it’s already packed and goes out the next day.

Two of this batch are heading out to the northern Ionian island of Paxos in May. There is a contingent of 5 Longboats based at Gaios on the island.

My centre plates are made in batches of 6 and I always aim to keep at least 2 in stock.

This was the centre plate removed from one of the Practical Workshop course Luggers in February. Way past its best and replaced immediately from stock by Paul and Chris. All the lifting and fitting was done by Paul and Chris on the third day of the course, so straightforward with advice and guidance.

Bimini and Deck Cushions for Peter

I have just been packing up a Bimini and deck cushions ready for Peter’s overland drive towing his Lugger across to the Ionian at the end of the week. Peter had noted the reviews I get from my Lugger charter clients about the benefits of having dual purpose deck cushions on board the Lugger. So a set of 4 are now ready to be dispatched to Peter today, along with his anchor shoes and cockpit bags.

Also a shout out to my Seamstress Karen. The meticulous work that goes into the making of the Biminis is second to none. Reinforced small tube pockets with holding flap and Velcro fasteners to secure the carbon fibre strengthening rods all enhance the durability of these Biminis.

A safe journey to the sun Peter.

  • Page 1
  • Page 2
  • Go to Next Page »

Copyright © 2026 Dragon Design · Contact Details · Terms & Conditions · Materials · About Us