Workshop Course 2 Report

What an opportunity this was to have father and son working on their respective father’s and grandfather’s Drascombe Lugger over this 4 day period. It certainly achieved its objectives and more in terms of progress, giving Chris and his son Paul the confidence and basic skills to make a start on this major rebuild and to undo the bad practices and so-called work that had been carried out over the intervening years when the boat was in another ownership.

I am finding that the basic programme that I have set out for these courses is a good starting point, since from experience the fundamental manufacturing issues that the older and certainly the later Mk3 models still display need rectification. This being, firstly the incomprehensible centreplate pivot pin fitting method, and secondly the replacement of the keelband and the relocation of the rudder guide plate to the face of the Keelband. Once these aspects are taken care of whilst the boat is turned over and in a spacious workshop, then other work and skills training can take place.

For Chris and Paul the working with wood was a new concept and whilst they found the techniques of using polyester resin and chopped strand mat difficult and ‘messy’ they got to appreciate the method and principles.

The original paint finish
Industrial stripper applied

The hull had been badly hand painted so this procedure of stripping just had to be endured to get it back to the gel coat, so I’m going to skip over this process since it is covered on Course 1. The stripping procedure using an industrial material was quickly achieved. Thank goodness!

The uncovering of the centreplate pivot pin was not a surprise. Of the 30 plus boats that I have done this process on, not one has been safe or useable, and most are significantly dangerous. In this instance this pin is original, supported on a small plate either side of the casing wall and floating under a cover of 2 layers of chopped strand matting, barely wetted out with resin.

The chopped strand mat pad that covered the pin and bracket should have been adhered to the casing. It was not bonded and as you can see the mat has not been saturated with resin and the fibres are still dry, hence it pulled off very easily.

With the weight and vibration of the heavy centreplate, the pin had worn an oversize hole in the wall of the centreplate casing. The pin is 12 mm diameter and the hole that it has created is 20 mm and oval!

Moving on, both areas were cleaned and prepared with the two new supporting plates firmly resting on the Keelband below so all the centreplate weight is taken and distributed on the lower keel area. It’s not ‘Rocket Science’, so where were these so-called Marine Engineers?

Once fitted, the pins is glassed over with a very good overlap either way to give good cover. Details of this procedure can be found on my How To Do It page.

Next the keelband is fitted – a 4 hour process with the boat turned over. Hull cleaned ready for antifoul primer, and what Chris and Paul were looking forward to was the pre-fitting of the boat’s joinery pieces.

Two days later, the hull was stripped and prepped, keelband and beaching rails fitted with 3 coats of antifoul primer and 2 coats of antifoul top coat applied. It’s all full-on hands-on work!

This is where the interesting work starts. Joinery is taken from the JLJ stock ready for pre-fitting. It’s Paul’s intention to spray finish the inside cockpit area of the boat back at home, then following on with a total re-finish of the outside of the hull in its original colours.

As a small deviation Paul had a poke about under the Lugger to find a rotten end to the centreplate. So, out it came and a new one fitted. Indeed it was not in a good state! Chris and Paul manhandled the centreplate into the boat to fit it.

The centreplate was way past its best. Note the enlarged pivot pin slot and the advanced degree of oxidisation. Just a plate of ‘Rust’ – not a pretty sight and a wise decision to change it at this stage. Just compare it to these 2025 newly-made and hot-dipped galvanised centreplates!

So by the end of day 3 we had fitted the new stern main sheet traveller rail and removed all the old joinery. All the original joinery had to be cut out since their holding screws / bolts were mild steel and totally decayed, as one can see from these engine mounting bolts. Chris became an expert at cutting out the original joinery.

This is much more satisfying work, pre-fitting the new joinery. With so much damage around the centreplate casing cover and the inevitable cut outs that had to be created for access to the centreplate pivot pin, a full set of casing facias were pre-fitted.

Both Chris and Paul were very good at fitting procedures, used to drilling, sockets and spanners, so all pre-fitting went well.

The last major job was in the removal of the stern transom board. The bronze holding screws didn’t want to move. That was before Chris had a go, then one by one they were out and the transom board was on the bench being sanded, a job that would have been difficult to do at home without good sanding tools.

And this is where the first stage of the rebuild of Kelpie ends. A very interesting and productive 4 days. My thanks to Chris and son Paul for bringing their new Lugger project Kelpie to start this wonderful rebuilding process to their respective Father’s and Grandfather’s Pride and Joy.

Video from Workshop Course 2

If you’d like a flavour of what goes on at one of our workshop courses, here’s a short video showing the participants at work.

Workshop Course 2 – Restoring ‘Kelpie’

For this second Practical Course just finished yesterday I had an aged, badly maintained and abused Lugger as a project boat, which has a very interesting history and background.

The boat is a 1972/3 Mk 2 model. I was contacted by Paul, her newly acquired owner who as a very young boy sailed the Lugger with his Grandfather out of Lyme Regis and has fond memories of those early days sailing the Lugger which his Granddad cherished. However, time moves on with school, college etc and after the death of his Grandfather the boat was loaned / given to the local Scout Group who used and abused the boat, adding some terrible so-called fittings and, from a boat in immaculate condition when bought new from Honnor Marine in the early 70’s, it was now not fit for the water and in a poor state.

Fortunately, Paul learned of the situation with the boat and that the Scout Group were no longer able or interested in the Lugger, and bought the boat back off the Scouts, determined and focused on undertaking a full rebuild of his Grandfather’s Lugger ‘Kelpie’. So on the evening of 3 February 2026 Paul, along with his Dad, Chris, arrived at Dragon Design to make a start on her rebuild.

I have just attached 2 pics of the hull state on arrival, her transom board and name plate and the hull back on its trailer. It was 4 hard and exhausting days for the rebuild, but so satisfying to be able to rectify the shoddy and totally inadequate work that had been done on the boat over the past 30 years plus.

Please follow this story from 16 February on this website.

Review: Workshop Course 1

Day 0

Arrived at the New Inn 17.00 in a great location for hiking, just south of Brecon. Rooms, food and beer. What more could you want. Neil is a great host. Phil has laid on a mini bus to take the group to and from his workshop. It’s about a 25 minute drive. This works out about £4 each for the four days and you can see the sights in between the rain and fog. Our chauffeur Rob, could talk for Wales about pretty much anything and is a mine of local information.

Day 1

Fellow student Paul and I grab tea and cereal. Pick up at 09.00. Overalls and at it by 09.30. Four of us flip the boat over and prop it up to get access underneath. Keel band and beaching rails removal. Spanners, screwdrivers and pry bars. Lunch break at cafe across road. There are holes left over that need to be filled later. Attached the new Keel band, which is not as easy as it looks.

Day 2

Rain won’t lift but we have seen the odd mountain between the clouds. Removing anti-foul. Not my favourite but a required skill. Satisfying to see it clean back to the gel coat. Three coats of primer applied and leave to dry overnight. Phil’s workshop is like an Aladdin’s cave of spars and joinery all reminding you how mediocre your boat looks until it has been ‘upgraded’. Bus back and everyone is hungry and tired. Neil and company fix that for us quickly.

Day 3

Last bit of anti foul removal and clean up. Anti fouling 2 coats. Cutting out lazarette flooring from Ply. Using router to chamfer and make holes. We file a missing sun report with the local constabulary and grab the bus and food. The weather is forecast to improve tomorrow!

Day 4

Ferries cancelled. We head to the workshop and get going on replacing the centreboard bolt and installing new steel casing. Fibre glass in the steel casing. Work fast for 2-3 hours on glassing. Bring knee pads if you have them, and an elastic head strap if you wear glasses for detail work. Fibre glassed of all the exposed screws heads and bolt heads. Back to the New Inn for food and beer and sleep.

Day 5

Fit the gunwale 18ft capping rails to my 14ft car with Phil’s help and set off for the Pembroke ferry with a red marigold waving off the back of the car.

What a week! Between Phil, Rob, Paul and Neil a great way to start a new year and with some new skills. Interpol have joined the hunt for the sun. Phil says it might be in Greece…

In Depth Workshop Report
Further Work for Christian

Workshop Course 1 Report

If you’re thinking of joining one of our courses and wonder what goes on, here’s a flavour from our first course of 2026.

Members’ kit
Workstation 1
Workstation 2
Glassfibre mat station

Firstly to ensure course members’ health and safety when working in this environment, each member has an overall to wear. There are heavy duty gauntlet rubber gloves and lighter surgical gloves. For working with resin and cutting of glassfibre it is important to wear a face mask in order to be protected from the harmful dust. I have also supplied tape measures, pencils and a notebook.

At Workstation 1 we have the communal battery tools, hand tools, saws and adhesive / sealants. When they are finished with they are returned to the workstation

At Workstation 2 I keep the very corrosive stripper, heavy duty gauntlet gloves, brushes, antifoul primer, etc

Lastly we have the workstation where the chopped strand mat is cut, polyester resin is measured and where the mat sections are ‘wetted out’. This is the process of saturating the mat with a stippling action to thoroughly penetrate the matting.

Now the work starts. With the boat empty of all flooring and equipment its trailer is reversed into the workshop area. The boat is now turned over and lifted off the floor to give sufficient clearance to be able to slide into the cockpit area of the upturned hull. We are now starting to remove the beaching rails and the old keelband. Some areas need cutting out and breaking away from the hull.

The old keelband is off and it exposes the original rudder guide which the builders have hidden under the keel. The rudder guide was very loose and I suspect was letting in water via the non-existent screw fixings that would have made their exit alongside the rudder case. A very poor design having it hidden under the keelband!

The hull is now ready for a dry run at fitting the new keel band. The entire area will then be cleaned before the final fit.

The new keelband and beaching rails in place, having checked the centre plate slot and that of the rudder to be correct, and covering the necessary areas.

We are now using the router to create a slot in the face of the keelband so the rudder guide is not hidden and is accessible. Note that with our keelband being 42 mm in thickness it is now possible to recess this guide below the surface by at least 5 mm, so there is no possibility of this guide coming into contact with hard ground.

We have stripped the hull of its various layers of antifoul in 2 areas either side of the keelband. This allowed the keelband and beaching rails to be fitted on the first day.

With the keelband fitted and all Iroko covering pellets in place the remainder of the hull is stripped of the nasty antifoul paints of varying vintages, from red oxide to numerous layers of poorly applied paints.

Day 3. The hull is now taped up on the waterline prior to the rolling application of firstly the Seajet primer. 4 full coats are applied.

You will note that apart from using this high density bonding / sealing agent under the keelband around the areas where the machine screws penetrate the hull in 5 places, we have also run neat beads of the sealant to bond the hull to keelband. It’s a good clean transition from the hull onto the keelband.

The antifoul applications of primer commence. It cures quickly and I apply it in what is referred to as a ‘wet on wet’ application, applying further coats onto a still tacky base.

Seajet is the preferred primer. It’s certainly expensive but it’s the best and with 4 priming coats you will not have any issues for a number of years.

At last, the hull is fully primed and ready for 2 coats of the antifoul finish coats.

The black antifoul goes on and at the end of day 3 the hull is completed and will be lifted and turned over this evening ready to be winched onto the trailer on Saturday morning.

On day 2 when we cut the rudder guide into the keelband with the router, I set up for Paul and Fearghal the opportunity to use the router to machine moulded edges and to plough slots in timber. They are powerful machines and not toys so its use gives the idea of how to safely handle such machine tools.

The machine screw that were used to fit both the beaching rails and keelband needs to be cut flush with its nut prior to being glassed over. This is Paul using a grinder to undertake this task. Again care needs to be taken when using a grinder for cutting stainless steel.

To get access to the centre plate pivot pin, one needs to cut this facia back. I have had owners shying away from this task of replacing the pivot pin, especially with these Mk3 models, thinking that the builders had learned the lessons of the earlier models and had improved with more advanced supporting practices. Alas, no! Don’t be deceived, this Lugger was as bad as many of the earlier models. You can’t have a 45 kg centre plate hanging and supported on 2 thin walls of the centre plate casing. In this boat’s case there was just a 3 mm slither of plywood encapsulated within the wall, then the 12 mm bolt drilled through into the opposing wall.

Here you see the process of cutting the access panel to expose the pivot pin.

When using polyester resin and mat it’s important to have all the tools and materials ready and easily available. The resin has a curing time of approx 20 to 40 minutes before it starts to get to a ‘jelly’ consistency. So I start by pre-cutting about 30 pieces of mat 170 by 110 mm before mixing the resin. Always weigh the resin in 500g units, then add 10 ml of the catalyst. Wet out 6 pieces of mat and place on a dry board which is handed into the person in the boat that is applying the mat. Always work on an area at least 80 mm away in all directions from the damage, or in this case the supporting plates, and also overlap on the last section my a third of its length.

Firstly you see the centre plate wall cleaned back with the pin head cut off. Before glassing, the whole area affected will be abraded back and thoroughly cleaned of any contamination or oxidisation.

On the opposite side the pin came through to a circlip, noting the oversize hole for a 12 mm bolt / pin.

This is what remains of the pivot pin and the piece of 2 mm hardboard that had an oversize hole drilled in it. There is no support or protection in this very thin pad.

With 6 wetted out sections of mat ready in the boat, Paul has started by applying 4 of these pieces onto the face of the casing. Only then do we assemble the 2 strengthening plates and the new centre plate pin. Fearghal did the same task on the opposing side.

At this stage we assemble the cleaned supporting plates that sit on the keel of the boat. These now take all the weight of the heavy centre plate, and not the thin walls of its casing.

With the 2 plates now bonded onto the mat, it’s time to start applying the wetted out mat sections around and onto the supporting plates, working off the floor, and then overlapping up the face.

The centre picture shows the first of a full cover on one side, we do another 2 covers each side.

Lastly the full cover, and the supporting plate is fully encapsulated in the wetted glassfibre mat. I use the same glassing technique and procedure on the bolt and nut ends that come through the hull which hold and fix the beaching rails and keelband to the hull.

All cleaned up, and work completed ready for phase 2 of work which Christian has now requested as a follow on from the course. This will be completed by myself starting the following week.

Fearghal’s Review
Follow-up Work for Christian

Workshop Course 1 Completed

This course was finalised with its project boat and participants back in November 2025. The Project Lugger was supplied by Christian and son Conor, who travelled down from Sheffield, whilst Paul travelled across from London although his Longboat is in Northern Ireland. I have met Paul and family out in the Ionian twice when they chartered my Lugger and apartment.

Fearghal, whose home base is in Kinsale in the Irish Republic where he has a Lugger, had the most challenging of journeys to get to South Wales, including cancelled ferries for his return at the end of the course. However, the meet up at the Bunkhouse, a part of the New Inn Bwlch, took place on the Tuesday evening as planned.

So that group members could relax and concentrate over the 4 days of workshop skills, I arranged the transportation to and from Tredegar and back each day. It’s a distance of 18 miles each way and normally a very picturesque route over the Brecon Beacons mountain road, though alas it wasn’t to be as it rained heavily each day.

However, this didn’t cast a shadow over the course; we were very much oblivious to this weather feature during the day whilst working on the Lugger, and getting back to the New Inn each evening where it was a warm and snug environment, and benefitting from the convivial attention of Neil our host it did indeed bring the course together over a few beers.

It was a great experience to have organised this course. Paul and Fearghal as attendees were such enthusiastic participants who got fully involved in the work on the boat, all with the aim of this summer attacking their own craft and getting work done now that they can feel much more confident in their own skills and abilities. Fearghal took a pair of Gunwale capping rails away with him on the roof rack, and has already been in touch with me for advice, having commenced in stripping off the old capping rails. As Drascombe owners know, ‘I’m just a phone call away to assist in their projects’

For Christian, he was so delighted with the work done on the course that he left the Lugger with me for an extra 10 days so I could do additional work and add more of the JLJ joinery and fittings.

My thanks must go to these guys who booked on the course as attendees and to Christian, the Lugger owner, who had faith in bringing his boat to my base at Tredegar. Christian was so delighted with the work done on the workshop course that he left his Lugger with me for an extra 10 days so I could do additional work and add more of the JLJ joinery and fittings.

Fearghal’s Review
Workshop in Depth Report
Further Work on Christian’s Lugger