• Skip to primary navigation
  • Skip to main content
Just Lugger Joinery

Just Lugger Joinery

  • Home
  • Products
    • Joinery
    • Spars
    • Accessories
  • How to Do It
  • Client Stories
  • Workshop Courses
  • Phil’s Workshop Blog
  • Ordering

Another week making stock joinery

My recent Practical Workshop Courses at Dragon Design in January and February has made a big impact on my joinery stock levels. You will note the courses have revolved around two of the major issues that Drascombe boats suffer from.

Firstly the centre plate pivot pin which was a fundamental design and manufacture disaster and sadly didn’t improve in the Mk3 period or to date with the upgraded Mk3 hull moulds. Secondly, the replacement of the keelbands and its upgrading to a more substantial section and a much better fitting method.

With over 30 good size boards of Iroko in stock having been machine thicknessed to 21.5 mm it’s a perfect opportunity to cut for 12 keelbands, all now laminated to a thickness of 41 mm, a few for the Mk 1 model and the rest for the later Mk 2&3.

I have shared my thoughts with JLJ followers on the method of lamination in past posts, so creating not only a section of 41 mm in thickness but because it’s made up of 2 laminations it’s considerably stronger and does not have a common grain at the areas of the centre plate and the rudder where slots have been machined out. 

A regular issue was that the 2 ‘side fingers‘ that remained after the centre plate slot was machined out would weaken and bend in towards the centreplate and pinch the plate. This doesn’t happen with the upgraded keelband, especially with the method of fixing these 2 fingers.

With the number of keelbands that have been sent to the States in 2025 and more recently to Pierre in the South of France, which all were of a jointed format to reduce the package length, it’s now necessary to make another 4 in a full kit form and pre-packaged ready for dispatch.

As you can see they are now all complete.

But for those interested in how we got there, here is what goes into making a JLJ keelband.

To start this process it’s necessary to machine-thickness the delivery of all the sawn-finish Iroko boards at one time. This means they are all of an identical thickness and finish, all at 21.5 mm

From this state with boards of a similar length but of a different width I can choose the board which will split to give me multiple lengths of the required width and with minimal wastage, or a wastage that I can identify as a width for other joinery, for instance legs and steps for swimming ladders or beaching rails. All this is done to minimise the wastage and so make it more cost effective.

This second picture shows the 4 sections required for a laminated and dry-jointed keelband, 2 forward sections and the 2 aft sections that are jointed just forward of the Lazarette.

Being all machined to width the process of lamination is straightforward and with using the West Resin System of bonding, one can be assured of a very good lamination. From a bonded state I then re-edge and then re-machine to a finished width of 68 mm which is the finished dimension of the keelband. In the second picture I have set out the rudder shaft 30 mm hole ready for machining of the centreplate and rudder slots.

The router is pre-set so all of this heavy machining process of cutting out these slots can done to all the keelbands without having to change the machine or setting. We are now getting the biggest process done and it’s moving onto the finishing detail. It’s good to run chamfers to the inner edges of the slots and not leave ragged sharp edges.

For the overall profile of the keelband, the underside edges that lie in the well of the hull’s mould these have to be radiused, and for the topside edge, which are in contact with the ground, these also have to be heavily radiused.

The second picture shows the forward top edge with a heavy chamfer cut back so it rides up easily when taking to ground.

I’m going to jump back a few processes to indicate the method of dry jointing the halving joint before doing the radiusing and machined slots.

I have cut and made up the ‘dry joint’ before performing these processes, then when complete taken them apart so the client can easily reassemble the 100 mm halving joint with the West Resin kit that I’ve provided and re-screw to the existing holes. This is s joint that will be Bomb Proof!

For Lugger owners of the Mk 1 boats, their keelband had an external full rudder guide plate recessed into the face of the keelband. A far better design than the current version where in their wisdom the builders fitted the bronze guide next to the hull and sandwiched under the keelband. Here you see the full stainless rudder guide plate fitted. It’s the preferred choice.

I would always remove the bronze guide from under the Keelband and, if the client wishes, recess it into the face of the topside. It’s an area at the stern of the boat that has little contact when grounded, the major area is around the centreplate and beaching rails.

You will note it’s recessed below the top face by at least 5 mm, so very little chance of getting in contact when grounding.

It’s very important that these fingers either side of the centreplate slot are fixed to the hull. These pre-drilled holes are 5 mm, and there are counterbored holes of 12 mm which are finished off by applying the Iroko pellets and finally sanded flush with the face.

The holes are drilled at a slight angle so they come out in the inside of the hull alongside the walls of the centreplate casing. The finishing of the inner hull screws and machine screws you can read about in my first Practical Workshop Blog

The Keelband comes complete with all the fittings and adhesive. Remember, I’m just a phone call away/email away if you need assistance or support.

So, there you have it. All complete and just awaiting packaging.

Don’t forget the majority of carriers wouldn’t accept lengths over 3m, although for the UK only and at a surcharge, UPS will deliver oversized lengths, and centre plates that are over 30 kg.

Not only a very good stock of Lugger keelbands but also ones ready for the Longboat, Coaster and Drifter.

Lastly getting ready to be packaged are 4 dry-jointed Mk 2/3 keelbands complete with fitting kits and pre-measured West Resin for the bonding process.

To Drascombe owners and followers of Just Lugger Joinery&more a reminder please: You not only purchase joinery, fittings and accessories of a high standard of manufacture from ourselves, but you can expect a great follow up, assistance and if need be help in matters relating to your specific problem. It’s from my 30 plus years of experience of sailing these craft and my hands-on experience in rebuilding the boats with redesigned and upgraded joinery and fittings, all to give my clients total confidence when dealing with Just Lugger Joinery&more.

Copyright © 2026 Dragon Design · Contact Details · Terms & Conditions · Materials · About Us