From a late phone call on Saturday evening 3 August, Alastair told me of his plight having attempted to sail under Wallingford bridge on the Thames which resulted in disaster, to Martin driving down 3 days later with a new fully varnished mast.
Indeed Alastair was so annoyed with himself for over-estimating the bridge height clearance, which resulted in the mast hitting the bridge with force and splitting it just above the mast thwart.
In discussion with Alastair over the phone he talked me through the damage and the fact that it had already been repaired before and there was 2 stainless clamps around the previous repair.
It was decided to get a new mast from our large stock up to him as soon as possible so he could get the most out of the summer weather.
Martin, my colleague, does these trips delivering around the country and also on a weekly basis he handles all the clients’ courier parts and joinery collections as mail order. In this case shot down the M4 from our base in Wales to deliver the mast near Reading.
All very successful and he has brought the original mast back with him with the possibility of remaking the lower section using Douglas Fir and a 500 mm long splice joint. This to be done on my return to Wales in mid November
Another successful mission for Just Lugger Joinery



