• Skip to primary navigation
  • Skip to main content
Just Lugger Joinery

Just Lugger Joinery

  • Home
  • Products
    • Joinery
    • Spars
    • Accessories
  • How to Do It
  • Client Stories
  • Workshop Courses
  • Phil’s Workshop Blog
  • Ordering

Newsletter, February 2025

Following the cold and rain of the past winter it’s now getting close to a time that one can spend preparing the Drascombe ready for a 2025 summer of sailing. However, with the age of these craft now catching up, the passage of time takes its toll on the fabric and structure of the boat. It’s not just the aspect of poor maintenance or neglect, it’s realistically just that annoying thing … TIME

So with an early start now, get its cover off, power wash her off and take a good look at the fundamentals and the structural aspects of the boat. As I prepare my own boats out in the Ionian Sea I set myself a general check list to work through. It’s better to do this now than to scramble at the last minute in May when one wants to get on the water.

One of my pet issues with Drascombes is the poor design and manufacture of the engine mounting bracket on the stern of the boat. Back in the early 70’s when the engine of choice was a small and featherweight British Seagull 2-stroke engine this was not an issue. However with the new larger 4-stroke engines the engine bracket is in no way sturdy or strong enough to support these engines. The originals were just 28mm in thickness and it’s very common now to see this splitting between the 2 top bolt holes.

A typical split between the 2 top bolts that support the engine bracket
Note the split on the edge of the bracket goes through to the wedge block behind
Oversize and badly damaged holes of the transom area that supports the engine bracket
All 4 holes in this transom of the 1972 Lugger have been affected

With the poor access to the inside of the Lazarette, owners are put off trying to keep these holding nuts tightened and consequently these elongated and oversize holes in the glass fibre body of the transom are created by the vibration and hanging weight of the engine.

So, at JLJ I have moved on to manufacture a 2-part laminated engine mounting bracket which is 40 mm in thickness so there is no common grain to split. The new kit also has with it two sections of 12mm marine ply to be fitted behind the glassfibre body to boost the surface area which the washers and nuts are faced to. To make the manufacturing process economic I produce upwards of 15 in one process. This reduces waste and each individual task can be repeated for all at the same time. It’s all about the ‘Economy of Scale’!

The second area of contention on the earlier Drascombes was the centre plate pivot pins. To say the least it was not the best of manufacturing practices, and could be deemed to be unsafe. The pivot pin/bolt was supported by two alloy bushes which in turn were supported only by the side cheek walls of the centre plate casing, these cheeks being barely 4 mm in thickness. With the weight of the centre plate at approximately 35 kg, the movement of it being lifted and lowered causes these alloy bushes to break away from the bonding material and then cause significant wear in the hole and for it to become oversize, resulting in water getting into the boat. A totally useless method and application.

A badly worn and enlarged hole that supports the centreplate pivot pin
These were the 2 Alloy Bosses that supported the pivot pin with packing string
The pivot bolt and the 2 bosses that were meant to be bonded onto the face of the centre plate case

These pictures illustrate the bolt and the bushes. It’s noted that a previous owner has tried to stop the flow of water getting past the alloy bushes by winding what looks like plumber’s twine around it and trying to pack out this cavity. It’s now time to rectify this issue and do a proper job once and for all.

My steel fabricator has made me up these A4 stainless 5mm thickness plates in pairs so that the centre of the bolt hole is pre-determined when the lower edge of the plate sits on the inside keel of the boat, ensuring that all the weight of the centre plate is taken on these plates and on the keel of the boat and not on the side walls of the centre plate casing. Once bonded to the side walls, the total area of the plates are bonded with chopped strand mat and resin. This process appears on my ‘How to Do It’ page.

The centre plate pivot plates supporting the pivot bolt
The bonding in of the centre plate supporting plates

The Keelband of the boat is another area which gets a lot of hard wear going to ground etc and being ‘out of sight’ it’s also ‘Out of mind’! The centre plate slot that’s machined into the keel band creates a weakness, and there are effectively 2 fingers left. They originally fitted two bolts either side set at an angle so they came through into the hull just alongside the centre plate casing, for this they used 6 mm machine screws with nuts and washers. The issues arise when taking to ground and the sideways movement of the boat and drag on these 2 remaining fingers of Keelband would cause then to break away from the retaining bolts, then creating a water ingress issue to be dealt with. There is clearly no way to repair these, so it’s a straightforward new Keelband to be fitted.

The Keelband in need of replacing
This Keelband was loose and just dropped off
The Keelband in very poor condition
The original band and the JLJ new version

Indeed Tiki’s Keelband literally fell off! It was all very loose and in extremely poor condition. As a comparison I have on the bench the original keel band at its max thickness is 26 mm alongside the new laminated version from JLJ which is 42 mm. The additional thickness helps, but it’s the laminating process that strengthens the whole structure, again, there is no common grain.

My preference is to turn the boat over. It can also be done when lifted up clear of the trailer, however it’s not as easy. By having it turned over you are then able to strip the old antifoul back to the gel coat, affect any glassfibre issues and make this job much more efficient. A full account of this process can be viewed on my weekly Tiki rebuild blog of just 5 weeks ago.

I follow the same principle of manufacturing when it comes to spars, that is to purchase the sawn Douglas Fir in quantity. Then I can select the length and width of boards to cut for each product which minimises on wastage. On the bench ready are lengths now cut for Gaffs along with two slabs about to be thicknessed through the machine on the left. There will be 4 gaffs cut out of each slab, rethicknessed to 42 mm square then passed through the large drum sander forward of the bench to give me the square finish ready to be tapered. From these original boards for the gaffs the offcut goes to make Bumpkins, with the final offcut to laminate up for main mast support crutches. So there is very low waste or offcuts and it’s more effective and time efficient being on my own working on this manufacturing process.

From a 200 mm wide board I can cut 4 Gaffs, then planed and thicknessed to the left and for a sanded finish through the drum sander in front of the picture
The waste that came off the boards that produced the Gaffs are turned into Bumpkins

We have so many of these components in stock now. Here you see three units of Lugger cockpit hatches complete with fitting templates. I have a steel laser cutting company in South Wales that manufactures these centre plates at four units per sheet, again optimising on scale. This one is headed out by UPS this week for a client in Devon.

Cockpit hatches now a stock item
Ready for collection, a centre plate left this week for a client in Devon

Early next week this pack containing a rudder and Mizen / rudder support complete with fitting kits heads out to Brittany, France by DHL Express; it’ll be there in 3 days.

A rudder and Mizen/rudder step being packed for a client in Brittany, France
All packed and awaiting a DHL collection to head off to Brittany

This is our JLJ laminated main mast support crutch made out of the offcuts from Douglas Fir that make our spars. A fine sanded finish at 66 mm square so it’s a nice snug fit in the mizen step.

The main mast support crutch
The mast support crutch is such a good fit

With 7 weeks of manufacturing left before I leave for the drive across to the Ionian Sea, my stock level will be high, even after taking several units out for delivery to Michel at Drascombe Nederland. This will be through a meet up near Lille in France in mid-April.

Your Drascombe joinery, fittings and equipment is just a phone call or email away. All orders are processed from stock throughout the summer by Martin my colleague, and he will get them to you via our carriers.

So whatever your needs for this upcoming season, it just takes a call or email for an instant response.

My very best and safe and enjoyable sailing for summer 2025.

Phil. Osborne

Copyright © 2026 Dragon Design · Contact Details · Terms & Conditions · Materials · About Us