Workshop Course 1 Report

If you’re thinking of joining one of our courses and wonder what goes on, here’s a flavour from our first course of 2026.

Members’ kit
Workstation 1
Workstation 2
Glassfibre mat station

Firstly to ensure course members’ health and safety when working in this environment, each member has an overall to wear. There are heavy duty gauntlet rubber gloves and lighter surgical gloves. For working with resin and cutting of glassfibre it is important to wear a face mask in order to be protected from the harmful dust. I have also supplied tape measures, pencils and a notebook.

At Workstation 1 we have the communal battery tools, hand tools, saws and adhesive / sealants. When they are finished with they are returned to the workstation

At Workstation 2 I keep the very corrosive stripper, heavy duty gauntlet gloves, brushes, antifoul primer, etc

Lastly we have the workstation where the chopped strand mat is cut, polyester resin is measured and where the mat sections are ‘wetted out’. This is the process of saturating the mat with a stippling action to thoroughly penetrate the matting.

Now the work starts. With the boat empty of all flooring and equipment its trailer is reversed into the workshop area. The boat is now turned over and lifted off the floor to give sufficient clearance to be able to slide into the cockpit area of the upturned hull. We are now starting to remove the beaching rails and the old keelband. Some areas need cutting out and breaking away from the hull.

The old keelband is off and it exposes the original rudder guide which the builders have hidden under the keel. The rudder guide was very loose and I suspect was letting in water via the non-existent screw fixings that would have made their exit alongside the rudder case. A very poor design having it hidden under the keelband!

The hull is now ready for a dry run at fitting the new keel band. The entire area will then be cleaned before the final fit.

The new keelband and beaching rails in place, having checked the centre plate slot and that of the rudder to be correct, and covering the necessary areas.

We are now using the router to create a slot in the face of the keelband so the rudder guide is not hidden and is accessible. Note that with our keelband being 42 mm in thickness it is now possible to recess this guide below the surface by at least 5 mm, so there is no possibility of this guide coming into contact with hard ground.

We have stripped the hull of its various layers of antifoul in 2 areas either side of the keelband. This allowed the keelband and beaching rails to be fitted on the first day.

With the keelband fitted and all Iroko covering pellets in place the remainder of the hull is stripped of the nasty antifoul paints of varying vintages, from red oxide to numerous layers of poorly applied paints.

Day 3. The hull is now taped up on the waterline prior to the rolling application of firstly the Seajet primer. 4 full coats are applied.

You will note that apart from using this high density bonding / sealing agent under the keelband around the areas where the machine screws penetrate the hull in 5 places, we have also run neat beads of the sealant to bond the hull to keelband. It’s a good clean transition from the hull onto the keelband.

The antifoul applications of primer commence. It cures quickly and I apply it in what is referred to as a ‘wet on wet’ application, applying further coats onto a still tacky base.

Seajet is the preferred primer. It’s certainly expensive but it’s the best and with 4 priming coats you will not have any issues for a number of years.

At last, the hull is fully primed and ready for 2 coats of the antifoul finish coats.

The black antifoul goes on and at the end of day 3 the hull is completed and will be lifted and turned over this evening ready to be winched onto the trailer on Saturday morning.

On day 2 when we cut the rudder guide into the keelband with the router, I set up for Paul and Fearghal the opportunity to use the router to machine moulded edges and to plough slots in timber. They are powerful machines and not toys so its use gives the idea of how to safely handle such machine tools.

The machine screw that were used to fit both the beaching rails and keelband needs to be cut flush with its nut prior to being glassed over. This is Paul using a grinder to undertake this task. Again care needs to be taken when using a grinder for cutting stainless steel.

To get access to the centre plate pivot pin, one needs to cut this facia back. I have had owners shying away from this task of replacing the pivot pin, especially with these Mk3 models, thinking that the builders had learned the lessons of the earlier models and had improved with more advanced supporting practices. Alas, no! Don’t be deceived, this Lugger was as bad as many of the earlier models. You can’t have a 45 kg centre plate hanging and supported on 2 thin walls of the centre plate casing. In this boat’s case there was just a 3 mm slither of plywood encapsulated within the wall, then the 12 mm bolt drilled through into the opposing wall.

Here you see the process of cutting the access panel to expose the pivot pin.

When using polyester resin and mat it’s important to have all the tools and materials ready and easily available. The resin has a curing time of approx 20 to 40 minutes before it starts to get to a ‘jelly’ consistency. So I start by pre-cutting about 30 pieces of mat 170 by 110 mm before mixing the resin. Always weigh the resin in 500g units, then add 10 ml of the catalyst. Wet out 6 pieces of mat and place on a dry board which is handed into the person in the boat that is applying the mat. Always work on an area at least 80 mm away in all directions from the damage, or in this case the supporting plates, and also overlap on the last section my a third of its length.

Firstly you see the centre plate wall cleaned back with the pin head cut off. Before glassing, the whole area affected will be abraded back and thoroughly cleaned of any contamination or oxidisation.

On the opposite side the pin came through to a circlip, noting the oversize hole for a 12 mm bolt / pin.

This is what remains of the pivot pin and the piece of 2 mm hardboard that had an oversize hole drilled in it. There is no support or protection in this very thin pad.

With 6 wetted out sections of mat ready in the boat, Paul has started by applying 4 of these pieces onto the face of the casing. Only then do we assemble the 2 strengthening plates and the new centre plate pin. Fearghal did the same task on the opposing side.

At this stage we assemble the cleaned supporting plates that sit on the keel of the boat. These now take all the weight of the heavy centre plate, and not the thin walls of its casing.

With the 2 plates now bonded onto the mat, it’s time to start applying the wetted out mat sections around and onto the supporting plates, working off the floor, and then overlapping up the face.

The centre picture shows the first of a full cover on one side, we do another 2 covers each side.

Lastly the full cover, and the supporting plate is fully encapsulated in the wetted glassfibre mat. I use the same glassing technique and procedure on the bolt and nut ends that come through the hull which hold and fix the beaching rails and keelband to the hull.

All cleaned up, and work completed ready for phase 2 of work which Christian has now requested as a follow on from the course. This will be completed by myself starting the following week.

Fearghal’s Review
Follow-up Work for Christian